1
·
The volumes of the Learning Center, the Laboratory Building and the ELAF Building on the GUtech campus remain basic and clear as a direct result of the request for highest efficiency. This serves well as a canvas for an intervention on the façade. Mirroring the idea of large-scale Arabic patterns used on the neighboring museum, a dynamically deformed pattern is being applied in a graphic way, thus appreciating the traditional logic of the ornament yet adding a contemporary twist to it.
Location Muscat, Oman
Size 11,000 m2 built-up area
Year 2015-
Scope Desig